Enterprise EHR Test Strategy

From Galen Healthcare Solutions - Allscripts TouchWorks EHR Wiki
Jump to navigation Jump to search

Overview

The Application Project Team is most often responsible for ensuring the application is properly setup and configured in a way that supports the application's end users. With some structure and planning, this team should be able to quickly and thoroughly validate the system.

General Preparation and Planning

  • Plan and schedule the testing cycle - Be as specific as possible when planning the the upcoming validation cycle. Everyone involved with the effort should know what they are responsible for, how to access the environment, how to log issues, etc. Be mindful of everyone's time and be assured everyone has the tools they need to be successful.
  • Testers - The Application Project Team will likely be responsible for the bulk of the time spent testing, however, every effort should be made to include folks outside of that team. Trained Superusers as well as Clinical Users (Providers, MA, Practice Admin, RN) should also be encouraged to help with this effort.
  • Test Patients - A broad spectrum of Test Patients should be used when testing. When validating Workflows scripts, more often the not, the test begins with selecting a Patient from the schedule. Starting here is import and will potentially uncover loopholes in the build configuration.
  • Role Based Testing - Different steps in the Workflow will required different User Roles of profiles. Each Workflow should reference Who is executing steps at any given time and also highlight when the workflow changes hands.
  • Issue Tracking - Some level of process must be used when reporting and tracking problems uncover during testing. The process should reflect the size and scope of the effort and above all must be understood by the team.
  • End of day recap - Keeping everyone on the same page throughout the duration of the test cycle is important. End of Day meetings are a good way to provide continuity and communication. Specific issues can be discussed, but the time is often best use to review roadblocks to getting the work done. If there are competing projects or issues preventing individuals from completing their assigned tasks, the Test Lead should reassign the work or help clear the roadblocks.
  • Retesting Workflows - Any Failed workflow should minimally be retested by the individual who uncovered or helped to resolve the issue. Resting changes to the build can get overlooked and

Clinical Workflow Documentation

  • Document
  • Make the Certified your own
  • Level of Detail
  • Review
  • Change Control
  • Build a living document

Test Cycle

  • Assign a Test Lead
  • Assign Testers - who, what, when, where
  • Assign the work -
  • Report your results
  • Do not hesitate to Fail a Workflow