Difference between revisions of "ConnectR Calendar Widget"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
− | * If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. | + | * If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. Fix, change the purge log days/hold log days to less than 180. Note, this will change the number of days messages last in the message log. |
Revision as of 21:59, 7 December 2011
If you receiving the below issue when trying to open the Calendar widget in ConnectR, please try the two troubleshoots suggested below.
- Make sure allow scriptlets is enabled. Follow steps below for assistance.
- If there are more than 180 days in the log for the interface, the calendar will not appear. The calendar URL is passed every day and it can't load due to too long of a URL. Fix, change the purge log days/hold log days to less than 180. Note, this will change the number of days messages last in the message log.