Difference between revisions of "11.2 Requisition Grouping Logic"
Jump to navigation
Jump to search
John.Buckley (talk | contribs) (Created page with "As of v11.2 the criteria that causes the requisition to split is noted below. • Ordering Encounter • To Be Done Date • Ordering Provider • Requested Performing Location ...") |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
As of v11.2 the criteria that causes the requisition to split is noted below. | As of v11.2 the criteria that causes the requisition to split is noted below. | ||
− | + | *Ordering Encounter | |
− | + | *To Be Done Date | |
− | + | *Ordering Provider | |
− | + | *[[Requested_Performing_Location]] | |
− | + | *Order not duplicated or already on the associated requisition | |
− | + | *Authorizing Provider | |
− | + | *Order Priority | |
− | + | *Ordering Site | |
− | + | *OID’s Never Combine on 1 Req Flag = False (Unchecked), if True (Checked) item gets its own req | |
− | + | *Specimen/Data Collection Date/Time (if collection done via UI dialog) | |
− | + | *[[Specimen_Type]] | |
− | + | *Temperature Requirements = Frozen (if order has specimen type specified) | |
− | + | *Schedule Order Parent | |
+ | *Specimen/Data To Be Collected In Office Flag |
Latest revision as of 19:58, 16 July 2014
As of v11.2 the criteria that causes the requisition to split is noted below.
- Ordering Encounter
- To Be Done Date
- Ordering Provider
- Requested_Performing_Location
- Order not duplicated or already on the associated requisition
- Authorizing Provider
- Order Priority
- Ordering Site
- OID’s Never Combine on 1 Req Flag = False (Unchecked), if True (Checked) item gets its own req
- Specimen/Data Collection Date/Time (if collection done via UI dialog)
- Specimen_Type
- Temperature Requirements = Frozen (if order has specimen type specified)
- Schedule Order Parent
- Specimen/Data To Be Collected In Office Flag