− | Dictionary clean-up very important, continue post go live | + | Dictionary clean-up very important, continue post go live for data migration and improved processes. Synchronizing and updating, reach out to vendors ahead of time so they can plan accordingly. There are more software updates with 6x compared to MAGIC, be prepared. |
==Interfaces== | ==Interfaces== |
Revision as of 20:09, 10 February 2016
Introduction
There is a lot to consider when migrating from MAGIC or Client/Server (C/S) 5.X to MEDITECH's 6.x. Infrastructure requirements are one of the important components of your migration journey. The following will hopefully assist in some of the decisions needed to ensure a successful migration to 6.x
Data Center Upgrade/Planning
- Use strategic capacity planning to future-proof your data center's virtualization efficiency and make the most of server hardware. Create a detailed inventory. Review current servers, 6.x uses a new category of servers for journaling transactions. Best practice suggests building either a Tier 3 or Tier 4 level of physical and network redundancy. Reliable power supply ensured via grid sectors to avoid surges and ensuring basic principles and best practices of data center airflow management also will assist in a successful approach to migration.
- WAN connections, increasing the bandwidth
- Wireless Network, are you running 802.11 a/b/g/n? Higher speeds are always desirable.
- Storage-As applications become more robust, storage needs will also grow. If you already don't have, you will need a SAN.
- Back-Up -ISB (Integrated Serverless Backup) is used by 6.x for more efficient backup and recovery
- Example Hardware Summary
Dictionary Management,Workflow, and Task Automation Technology
Dictionary clean-up very important, continue post go live for data migration and improved processes. Synchronizing and updating, reach out to vendors ahead of time so they can plan accordingly. There are more software updates with 6x compared to MAGIC, be prepared.
Interfaces
- Custom Interfaces- If you have custom interfaces, what are their roles with 6.x?
- Review all departments expectations with interfacing
- Interface differentiators with 6.x (ADT 2.1 to 2.4)
Downtime Procedures/Business Continuity/Disaster Recovery
Have documented policies and procedures for both clinical and non-clinical departments. Some questions to ask- Is staff well versed in downtime procedures? Is unscheduled downtime handled differently than scheduled downtime? There are many tools that can be used for business continuity in the event of system downtime.
Implementation Time Line/Change Management
Plan for 1-3 years depending on the size of your organization. Planning begins with Project Governance creation and Project Definition. A 6.x migration is similar to a net new implementation and requires the same time and resources as a new installation. Cultural change process needs physician buy in and engagement. Take into consideration workflow documentation and current state and gap analysis. Do not downplay the importance of training both clinical and nonclinical staff. Prior to go-live, have in place your EHR Steering Committee and physician champions to assist with clinical decision making. Have a procedure in place that allows for changes to occur following a quick review process.
Tips and Tricks
If you use a third party or add on vendor for dispersing clinical reports, a few items to keep in mind:
- The MEDITECH C/S 6.x is a completely different HCIS and does process reports differently from MAGIC. Modifications will need to be made to ensure that reports are processed properly.
- Windows printers need to be configured to receive reports for C/S 6.x. C/S 6.x does not have embedded printing routines.
- Review your report distribution templates and make necessary changes so that C/S 6.x reports are properly processed.
- Prior to processing reports generated by the C/S 6.x system, import a MIS provider dictionary from the C/S HCIS.